INFODEV     ISO 9001:2000

Frequently Asked Questions, Transit Division

Here is a list of questions our clients often ask us. If you don't see your question in the list below, please send it to us.

General

fold faq What type of sensor is normally provided? (Please indicate if the sensor is of the IR type, whether it is active or passive, and provide a general description of its operation).
fold faq What types of buses have you installed as of today? Are these types of buses low floor or stairs?
fold faq How many sensors would be required for a New Flyer installation?
fold faq What is the typical accuracy of the raw passenger count data (ons/offs) prior to post-processing?
fold faq Can the GPS system accept bus stop numbers for locators?

Positioning

fold faq What type of position finding equipment is normally provided? (i.e. odometer, radio signpost, GPS, combination)
fold faq What is the typical spatial resolution of the GPS equipment?
fold faq Where would the position finding equipment be mounted in a D-40LF?

Microcontroller / Firmware

fold faq What inputs are typically received by the mcu/pcu? (i.e. door switches, odometer, ramp switch)
fold faq Does the system gather the following data for each stop: time of arrival, location, ons/offs through each door, ramp deployment, time of departure? If not, which data is unavailable?
fold faq Can the on-board mcu/pcu identify bus stops by reference to a look-up table in memory and output a bus stop reference instead of other geographic location data?
fold faq Is the on-board memory capable of storing data for all stops made in a full day (18+ hours) of bus service? What is the maximum storage capacity?

Data Storage and Transmission

fold faq How is the raw APC data transmitted/downloaded for processing? (i.e. floppy disk, memory card, hand held unit, IR link, radio link, cellular link)
fold faq What is the typical frequency of download? (real time, daily, weekly, monthly)
fold faq What standard is used to transmit the data from the bus to the post processing software? Are any proprietary standards used?
fold faq What if any special equipment is required to receive data? Is this equipment typically provided by Infodev?
fold faq What would be the anticipated minimum and maximum time to download the on-board data?
fold faq What standard(s) is used to transmit and record GPS data?

Hardware - General

fold faq Would any on-board hardware components be open to public view and exposed to possible vandalism?
fold faq Are the system components enclosed in waterproof or moistureproof housings?
fold faq What are the voltage and current requirements of the system?
fold faq Can the system be mounted onto and adapted to work with a light rail vehicle? Is the system in operation on any light rail vehicles?

Software Standards

fold faq What is the hardware requirement and operating system for post-processing raw APC data?
fold faq What database software is utilized?
fold faq Are any proprietary standards used in the transmission or processing of APC data?
fold faq Which open technical standards are utilized and for what processes?

Validation

fold faq Is a software driven process provided to verify data from each run prior to adding the data to the general database?
fold faq Is an efficient error correction algorithm provided to compensate for sensor errors and balance cumulative bus loads? What is the minimum accuracy of the APC system (%) after adjustment?
fold faq Is there a process to recover partial data from a batch which does not verify in the screening process?
fold faq How much labour/time is required to process raw data and prepare routine standard reports? What are the standard reports?

Report Generation

fold faq Will software accept input from Hastus scheduling software file?
fold faq Is software available to prepare the reports?
fold faq Can the reports be modified in-house or is Infodev's support required? Can third party support be used?
fold faq Is there software available off-the-shelf from Infodev which would provide most of the reports?

Reliability, Warranty, Service and Support

fold faq Is Infodev's APC equipment installed and operating successfully with a Canadian transit organization? If so, which one(s)?
fold faq What warranty is typically provided with purchase of the APC system ? Are there additional support plans available?
fold faq What is the mean time between failure (MTBF) for each component (sensors, mcu/pcu, GPS, peripherals)?
fold faq Are training and complete English language manuals available for installation, use and maintenance of hardware and software components?
fold faq How will equipment failures be serviced during a warranty period? What is the maximum equipment down-time? Where is the closest service outlet?
fold faq What equipment or hardware is required to be supplied by the user of the APC system?
fold faq How much labour/time is required to install one APC unit in one bus?


Download brochures